Dredging The St. Lawrence

These pictures show dredges at work on the river.

They scooped out the river bed so that a minimum water depth of 40 feet was available after the flooding. The shipping channel is several hundred yards wide so that the ships can easily pass each other if going in opposite directions.

     # g001



[ View Pictures ] [ Search This Site ] [ Contact Webmaster ] [ Home ]

Tek Master
P.O. Box 346
Long Sault, On, K0C 1PO
Phone: 613-537-8503